Bill

Bill > A4513


NJ A4513

NJ A4513
Requires electric public utilities to implement certain improvements to interconnection process for certain grid supply solar facilities and energy storage facilities.


summary

Introduced
06/06/2024
In Committee
12/09/2024
Crossed Over
Passed
Dead

Introduced Session

2024-2025 Regular Session

Bill Summary

Requires electric public utilities to implement certain improvements to interconnection process for certain grid supply solar facilities and energy storage facilities.

AI Summary

This bill requires electric public utilities in New Jersey to implement certain improvements to the interconnection process for grid supply solar facilities and energy storage facilities with a capacity of 20 megawatts or less. The key provisions include: requiring utilities to accept and process interconnection applications for these facilities, unless the application is incomplete or the proposed interconnection is unsafe or a risk to the stability, reliability, or power quality of the utility's system; requiring utilities to provide recommendations to applicants on how to modify incomplete or problematic applications; requiring utilities to timely process complete applications and provide an initial feasibility study within 90 days; allowing the interconnected facilities to be eligible for applicable state incentives; and directing the Board of Public Utilities to adopt rules and regulations for implementing the bill's provisions.

Committee Categories

Transportation and Infrastructure

Sponsors (5)

Last Action

Substituted by S3308 (2R) (on 12/19/2024)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...