AN ACT to amend the energy law, in relation to explicitly permitting the standard utility interconnection of sub-transmission lines for particular projects

AI Summary

This bill amends New York's energy law by adding a new section (21-107) that allows distributed generation energy projects to connect to utility distribution systems at the sub-transmission level, provided they meet all state and federal requirements. In plain language, this means that smaller-scale energy generators (such as solar or wind installations) will now be permitted to link into the electrical grid at a level typically reserved for larger transmission infrastructure, using the same interconnection process that applies to transmission-level connections. The bill specifically references the state's Standardized Interconnection Requirements (SIR) and ensures that these distributed generation projects can connect to the utility grid despite any existing regulations that might have previously prevented such connections. This change could potentially make it easier and more streamlined for smaller energy producers to feed electricity into the broader power grid, potentially supporting renewable energy development and distributed energy generation strategies.

Committee Categories

Transportation and Infrastructure

Sponsors (1)

Last Action

REFERRED TO ENERGY AND TELECOMMUNICATIONS (on 01/07/2026)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...