NY A07728Permits the standard utility interconnection of sub-transmission lines for particular projects.
summary
Introduced
04/08/2025
04/08/2025
In Committee
01/07/2026
01/07/2026
Crossed Over
Passed
Dead
Introduced Session
2025-2026 General Assembly
Bill Summary
AN ACT to amend the energy law, in relation to explicitly permitting the standard utility interconnection of sub-transmission lines for particular projects
AI Summary
This bill amends New York's energy law to explicitly permit distributed generation projects to connect to utility distribution systems at the sub-transmission level, provided they meet all state and federal requirements. Sub-transmission lines are electrical power lines that operate at voltage levels between transmission and distribution lines, typically used to transfer electricity from major power plants to local distribution networks. The bill requires that these interconnections follow the same process as connections at the transmission level, effectively standardizing the interconnection procedures under the state's Standardized Interconnection Requirements (SIR). This change aims to make it easier for various forms of distributed generation—such as solar, wind, or other renewable energy sources—to connect to the electrical grid, potentially facilitating greater renewable energy deployment and grid flexibility. The bill takes effect immediately upon passage, allowing for prompt implementation of the new interconnection provisions.
Committee Categories
Agriculture and Natural Resources
Sponsors (1)
Last Action
referred to energy (on 01/07/2026)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://www.nysenate.gov/legislation/bills/2025/A7728 |
| BillText | https://assembly.state.ny.us/leg/?default_fld=&bn=A07728&term=2025&Summary=Y&Actions=Y&Text=Y&Committee%26nbspVotes=Y&Floor%26nbspVotes=Y#A07728 |
Loading...