This bill authorizes 2 distributed generation resources to participate in the State's net energy billing program, despite the projects' failure to meet certain participation criteria.

AI Summary

This bill allows two specific distributed energy resource projects located in Ellsworth and Presque Isle, Maine, to participate in the state's net energy billing program, despite missing certain regulatory deadlines. The bill specifically addresses projects by Ameresco Solar, LLC (a 1.99-megawatt project) and Nordic Sun Energy, LLC (a 3-megawatt project), which experienced external delays in interconnection and transmission impact studies that prevented them from meeting original commercial operation deadlines. These delays were caused by Versant Power's extended procurement lead times and transmission impact study processes. Both projects were fully constructed before the December 31, 2024 deadline and are considered critical to Maine's goal of sourcing 100% of its electricity from renewable sources by 2040. The bill provides an emergency exemption, allowing these projects to enter the net energy billing program when they commence commercial operation, effectively overriding previous eligibility requirements. The legislation is designed to support renewable energy development by providing flexibility for projects that have experienced legitimate external delays beyond their control.

Committee Categories

Transportation and Infrastructure

Sponsors (3)

Last Action

Placed in the Legislative Files. (DEAD) (on 06/12/2025)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...