NJ A257Directs BPU to conduct study to determine whether deployment of microgrids and generators will reduce length of power outages.
summary
Introduced
01/13/2026
01/13/2026
In Committee
01/13/2026
01/13/2026
Crossed Over
Passed
Dead
Introduced Session
2026-2027 Regular Session
Bill Summary
This bill directs the Board of Public Utilities (BPU) to study, prepare, and submit, within six months of the enactment of the bill, to the Governor and to the Legislature a written report that is to contain findings and recommendations concerning whether the utilization of microgrids and the deployment of electric generators will assist in reducing the length of long-term power outages in this State. The BPU's report is to also provide recommendations for improvements to the resilience and reliability of the State's electric distribution system. In conducting the study, the BPU is to: 1) compare the general performance of this State's electric distribution system as compared to that of other states; 2) assess the impact of the utilization of microgrids and the deployment of electric generators on long-term power outages in other states; 3) consult with relevant persons and public and private entities in this State and other states that have utilized microgrids during power outages; 4) consult with relevant electric public utilities in this State and other states that have deployed electric generators to communities during power outages; 5) and consider the cost to ratepayers, municipalities, electric public utilities, and the State associated with the implementation of the findings and recommendations submitted pursuant to this bill. The bill defines "microgrid" as a group of interconnected loads and distributed energy resources within clearly defined electrical boundaries that acts as a single controllable entity with respect to the electric grid, which can connect and disconnect from the electric grid to enable it to operate both connected to, or independent of, the electric grid.
AI Summary
This bill directs the Board of Public Utilities (BPU) to conduct a study and submit a report within six months to the Governor and Legislature on whether using microgrids and electric generators can shorten the duration of long-term power outages in the state, and to recommend improvements for the electric system's resilience and reliability. A microgrid is defined as a group of connected energy resources and users that can operate independently of the main electric grid. The BPU's study will involve comparing the state's electric system performance to other states, assessing the impact of microgrids and generators on outages elsewhere, consulting with relevant experts and entities that have used these technologies, and considering the costs to consumers, municipalities, utilities, and the state for implementing any recommendations.
Committee Categories
Transportation and Infrastructure
Sponsors (2)
Last Action
Introduced, Referred to Assembly Telecommunications and Utilities Committee (on 01/13/2026)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://www.njleg.state.nj.us/bill-search/2026/A257 |
| BillText | https://pub.njleg.gov/Bills/2026/A0500/257_I1.HTM |
Loading...