Bill Summary
For legislation to create flexibility in contracting for public construction. State Administration and Regulatory Oversight.
AI Summary
This bill aims to provide more flexibility in how public construction projects are contracted by allowing awarding authorities, for projects costing at least $5,000,000, to use alternative project delivery methods beyond the traditional design-bid-build approach, which involves separate contracts for design and then construction based on that design. Specifically, it introduces and defines "design-build-finance-operate-maintain" (DBFOM), where a single contract covers design, construction, financing, operation, and maintenance over a set period without using state appropriated funds for contractor services during that time, and "design-build-operate-maintain" (DBOM), where a single contract covers design, construction, maintenance, and operation, with state funds appropriated beforehand or secured through user fees. The bill also redefines "design build contract" and "design build entity" to encompass these broader "alternative delivery method contracts" and "alternative delivery method entities," respectively, and requires approval from the inspector general before utilizing these new methods.
Committee Categories
Government Affairs
Sponsors (1)
Last Action
Accompanied a study order, see S2386 (on 07/05/2016)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://malegislature.gov/Bills/189/Senate/S1669 |
| State Bill Page | https://malegislature.gov/Bills/189/S1669 |
| Bill | https://malegislature.gov/Bills/189/S1669.pdf |
Loading...