summary
Introduced
03/29/2021
03/29/2021
In Committee
03/28/2022
03/28/2022
Crossed Over
Passed
Dead
12/31/2022
12/31/2022
Introduced Session
192nd General Court
Bill Summary
For legislation relative to life cycle costs for long term pavement solutions. Transportation.
AI Summary
This bill aims to require the Massachusetts Department of Transportation to conduct a life-cycle cost analysis for all pavement projects exceeding $1 million in total cost that are funded with state funds. The department must design each project using both hot mix asphalt (HMA) and plain jointed cementitious concrete (PJCC) and award the project to the material with the lowest life-cycle cost. The bill also mandates the department to conduct at least four PJCC demonstration projects per year for a minimum of 10 years to generate historical data for the life-cycle cost analysis. The goal is to identify long-term pavement solutions that minimize overall costs and improve performance in areas like friction, surface stress, noise reduction, and ride quality.
Committee Categories
Budget and Finance, Transportation and Infrastructure
Sponsors (24)
Mike Moore (D)*,
Jim Arciero (D),
Brian Ashe (D),
Bruce Ayers (D),
Michael Brady (D),
Edward Coppinger (D),
Brendan Crighton (D),
John Cronin (D),
Diana Dizoglio (D),
Kim Ferguson (R),
Paul Frost (R),
Jessica Giannino (D),
Anne Gobi (D),
Hannah Kane (R),
Mike Kushmerek (D),
Joe McGonagle (D),
Dave Muradian (R),
Brian Murray (D),
Patrick O'Connor (R),
Angelo Puppolo (D),
Mike Rush (D),
Alan Silvia (D),
John Velis (D),
Jon Zlotnik (D),
Last Action
Bill reported favorably by committee and referred to the committee on Senate Ways and Means (on 03/28/2022)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
Document Type | Source Location |
---|---|
State Bill Page | https://malegislature.gov/Bills/192/S2358 |
Bill | https://malegislature.gov/Bills/192/S2358.pdf |
Loading...