Requires BPU to study and implement methods to allow additional distributed energy sources to interconnect to electrical grid.


summary

Introduced
01/09/2024
In Committee
01/09/2024
Crossed Over
Passed
Dead

Introduced Session

2024-2025 Regular Session

Bill Summary

This bill would require the Board of Public Utilities (BPU) to conduct a study for the purpose of identifying, researching, and quantifying the effects of short-term solutions that could enable segments of the electrical transmission and distribution system to host greater amounts of power from distributed energy generation sources. The study would also including planning for the testing and implementation of the solutions. The bill would require the BPU to consider the following potential solutions, as well as any additional potential solutions identified by the BPU: (1) permitting the flow of electricity, through an electrical substation, from the distribution system to the transmission system; (2) requiring solar inverters to include, activate, and use technology that allows the inverter to inject and absorb reactive power autonomously or in response to remote control; (3) requiring energy storage systems to include, activate, and use technology that allows the energy storage system to inject or absorb real and reactive power; and (4) requiring solar photovoltaic systems to include, activate, and use technology and services that enable the power output of the system to respond to short term prediction of weather conditions to control the rate-of-change of the power output, or other system parameters. As defined by the bill, "reactive power" means the portion of alternating current electricity, measured in volt-amperes reactive, that cannot do useful work due to a misalignment of the current and voltage waveforms of the electricity. The bill would require the BPU to submit a final report on its study to the Governor and the Legislature within one year after the bill's effective date, which contains recommendations for legislative, regulatory, or local governmental action. The bill would also require the BPU to adopt rules and regulations to implement the recommended regulatory action, within one year after the final report is published. The bill would direct the BPU to initially apply the recommendations as a pilot program and then, if successful, provide for Statewide implementation of the rules and regulations.

AI Summary

This bill would require the Board of Public Utilities (BPU) to conduct a study to identify and research short-term solutions that could enable the electrical transmission and distribution system to accommodate more power from distributed energy generation sources. The study would also include planning for the testing and implementation of these solutions. The bill specifies several potential solutions the BPU must consider, such as allowing electricity to flow from the distribution system to the transmission system, and requiring certain technologies in solar inverters, energy storage systems, and solar photovoltaic systems to improve grid flexibility and responsiveness. The BPU would be required to submit a report with recommendations within one year and then adopt rules and regulations to implement the recommended solutions as a pilot program, which could then be expanded statewide if successful.

Committee Categories

Agriculture and Natural Resources

Sponsors (3)

Last Action

Senate Environment and Energy Hearing (10:00:00 2/5/2024 Committee Room 6, 1st Floor, State House Annex, Trenton, NJ) (on 02/05/2024)

bill text


bill summary

Loading...

bill summary

Loading...

bill summary

Loading...