Energy generation resources.


summary

Introduced
01/13/2025
In Committee
04/08/2025
Crossed Over
02/14/2025
Passed
04/16/2025
Dead
Signed/Enacted/Adopted
05/06/2025

Introduced Session

2025 Regular Session

Bill Summary

Energy generation resources. Provides a credit against state tax liability for expenses incurred in the manufacture of a small modular nuclear reactor (SMR) in Indiana. Establishes procedures under which certain energy utilities may request approval for one or more of the following from the Indiana utility regulatory commission (IURC): (1) An expedited generation resource plan (EGR plan) to meet customer load growth that exceeds a specified threshold. (2) A generation resource submittal for the acquisition of a specific generation resource in accordance with an approved EGR plan. (3) A project to serve one or more large load customers. Sets forth: (1) the requirements for approval of each of these types of requests; (2) standards for financial assurances by large load customers; and (3) cost recovery mechanisms for certain acquisition costs or project costs incurred by energy utilities. Amends the statute concerning public utilities' annual electric resource planning reports to the IURC to provide that for an annual report submitted after December 31, 2025, a public utility must include information as to the amount of generating resource capacity or energy that the public utility plans to retire or refuel with respect to any electric generation resource of at least 125 megawatts. Provides that for any planned retirement or refueling, the public utility must include, along with other specified information, information as to the public utility's plans with respect to the following: (1) For a retirement, the amount of replacement capacity identified to provide approximately the same accredited capacity within the appropriate regional transmission organization (RTO) as the capacity of the facility to be retired. (2) For a refueling, the extent to which the refueling will maintain or increase the current generating resource accredited capacity or energy that the electric generating facility provides, so as to provide approximately the same accredited capacity within the appropriate RTO. Requires IURC staff to prepare a staff report for each public utility report that includes a planned electric generation resource retirement. Provides that if, after reviewing a public utility's report and any related staff report, the IURC is not satisfied that the public utility can satisfy both its planning reserve margin requirement and the statute's prescribed reliability adequacy metrics, the IURC shall conduct an investigation into the reasons for the public utility's inability to meet these requirements. Provides that if the public utility's report indicates that the public utility plans to retire an electric generating facility within one year of the date of the report, the IURC must conduct such an investigation. Provides that: (1) a public utility may request, not earlier than three years before the planned retirement date of an electric generation facility, that the IURC conduct an investigation into the planned retirement; and (2) if the IURC conducts an investigation at the request of the public utility within that three year period, the IURC may not conduct a subsequent investigation that would otherwise be required under the bill's provisions unless the IURC is not satisfied that the public utility can satisfy both its planning reserve margin requirement and the statutory reliability adequacy metrics as of the time the investigation would otherwise be required. Provides that if a CPCN is granted by the IURC for a facility intended to repower or replace a generation unit that is planned for retirement, and the CPCN includes findings that the project will result in at least equivalent accredited capacity and will provide economic benefit to ratepayers as compared to the continued operation of the generating unit to be retired, the CPCN constitutes approval by the IURC for purposes of an investigation that would otherwise be required. Provides that if, after an investigation, the IURC determines that the capacity resources available to the public utility will not be adequate to allow the public utility to satisfy both its planning reserve margin requirements and the statute's prescribed reliability adequacy metrics, the IURC shall issue an order: (1) directing the public utility to acquire or construct; or (2) prohibiting the retirement or refueling of; such capacity resources that are reasonable and necessary to enable the public utility to meet these requirements. Provides that if the IURC does not issue an order in an investigation within 120 days after the initiation of the investigation, the public utility is considered to be able to satisfy both its planning reserve margin requirement and the statutory reliability adequacy metrics with respect to the retirement of the facility under investigation. Provides that if the IURC issues an order to prohibit the retirement or refueling of an electric generation resource, the IURC shall create a sub-docket to authorize the public utility to recover in rates the costs of the continued operation of the electric generation resource proposed to be retired or refueled, subject to a finding by the IURC that the continued costs of operation are just and reasonable. Makes a technical change to another Indiana Code section to recognize the redesignation of subsections within the section containing these provisions.

AI Summary

This bill introduces several significant changes to Indiana's energy policy and utility regulation. It creates a tax credit program for small modular nuclear reactor (SMR) manufacturing, establishes new procedures for expedited generation resource planning, and modifies regulations around electric utility resource planning and generation facility retirements. Specifically, the bill provides a 20% tax credit for qualified investments in SMR manufacturing in Indiana, with credits that can be carried forward but not refunded. It also creates new pathways for energy utilities to rapidly obtain approval for generation resource plans and projects to serve large load customers, including streamlined review processes and specific requirements for filing petitions. The bill mandates more detailed reporting from public utilities about planned generation resource retirements and refueling, requiring utilities to provide comprehensive information about capacity, location, fuel sources, and replacement plans. Additionally, the legislation gives the Indiana Utility Regulatory Commission enhanced oversight and investigation powers regarding utility resource planning, with provisions for reviewing and potentially blocking planned generation facility retirements that might compromise electric service reliability. The bill aims to balance economic development, energy infrastructure investment, and maintaining reliable electric service for Indiana customers.

Committee Categories

Budget and Finance, Transportation and Infrastructure

Sponsors (41)

Ed Soliday (R)* David Abbott (R),  Mike Aylesworth (R),  Beau Baird (R),  Steve Bartels (R),  Bruce Borders (R),  Martin Carbaugh (R),  Matthew Commons (R),  Kendell Culp (R),  Dale DeVon (R),  Craig Haggard (R),  David Hall (R),  Bob Heaton (R),  Dave Heine (R),  Chris Jeter (R),  Jack Jordan (R),  Chris Judy (R),  Mike Karickhoff (R),  Eric Koch (R),  Ryan Lauer (R),  Matthew Lehman (R),  Daniel Lopez (R),  Jim Lucas (R),  Chris May (R),  Wendy McNamara (R),  Doug Miller (R),  David Niezgodski (D),  Julie Olthoff (R),  J.D. Prescott (R),  Jim Pressel (R),  Linda Rogers (R),  Daryl Schmitt (R),  Alaina Shonkwiler (R),  Ben Smaltz (R),  Hunter Smith (R),  Craig Snow (R),  Greg Steuerwald (R),  Jake Teshka (R),  Jeff Thompson (R),  Tim Wesco (R),  Alex Zimmerman (R), 

Last Action

Public Law 217 (on 05/06/2025)

bill text


bill summary

Loading...

bill summary

Loading...

bill summary

Document Type Source Location
State Bill Page https://iga.in.gov/legislative/2025/bills/house/1007/details
Fiscal Note #1: Senate Enrolled https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/fiscal-notes/HB1007.08.ENRS.FN001.pdf
BillText https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/HB1007.08.ENRS.pdf
Fiscal Note #2: Senate Engrossed https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/fiscal-notes/HB1007.07.ENGS.FN002.pdf
Fiscal Note #1: Senate Engrossed https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/fiscal-notes/HB1007.07.ENGS.FN001.pdf
BillText https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/HB1007.07.ENGS.pdf
Senate Amendment #1 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/amendments/HB1007.06.COMS.AMS001.pdf
Senate Amendment #2 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/amendments/HB1007.06.COMS.AMS002.pdf
Senate Amendment #3 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/amendments/HB1007.06.COMS.AMS003.pdf
Senate Amendment #4 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/amendments/HB1007.06.COMS.AMS004.pdf
Senate Amendment #5 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/amendments/HB1007.06.COMS.AMS005.pdf
Senate Amendment #6 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/amendments/HB1007.06.COMS.AMS006.pdf
Senate Amendment #7 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/amendments/HB1007.06.COMS.AMS007.pdf
Fiscal Note #1: Senate Comm Sub https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/fiscal-notes/HB1007.06.COMS.FN001.pdf
BillText https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/HB1007.06.COMS.pdf
Senate Committee Report https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/committee-reports/HB1007.05.COMS.CRS001.pdf
Vote Sheet April 08, 2025 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/votesheets/HB1007.05.COMS.00.pdf
Fiscal Note #1: Senate Comm Sub https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/fiscal-notes/HB1007.05.COMS.FN001.pdf
BillText https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/HB1007.05.COMS.pdf
Senate Utilities Amendment #5 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/committee-amendments/amendments/HB1007.04.ENGH.AMS05.pdf
Senate Utilities Amendment #6 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/committee-amendments/amendments/HB1007.04.ENGH.AMS06.pdf
Senate Committee Report https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/committee-reports/HB1007.04.ENGH.CRS001.pdf
Vote Sheet March 27, 2025 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/votesheets/HB1007.04.ENGH.01.pdf
Fiscal Note #2: House Engrossed https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/fiscal-notes/HB1007.04.ENGH.FN002.pdf
BillText https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/HB1007.04.ENGH.pdf
Fiscal Note #1: House Engrossed https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/fiscal-notes/HB1007.04.ENGH.FN001.pdf
House Amendment #1 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/amendments/HB1007.03.COMH.AMH001.pdf
House Amendment #2 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/amendments/HB1007.03.COMH.AMH002.pdf
House Amendment #3 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/amendments/HB1007.03.COMH.AMH003.pdf
BillText https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/HB1007.03.COMH.pdf
Fiscal Note #1: House Comm Sub https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/fiscal-notes/HB1007.03.COMH.FN001.pdf
House Committee Report https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/committee-reports/HB1007.02.COMH.CRH001.pdf
Vote Sheet February 05, 2025 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/votesheets/HB1007.02.COMH.04.pdf
Fiscal Note #1: House Comm Sub https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/fiscal-notes/HB1007.02.COMH.FN001.pdf
BillText https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/HB1007.02.COMH.pdf
House Committee Report https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/committee-reports/HB1007.01.INTR.CRH001.pdf
Vote Sheet January 28, 2025 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/votesheets/HB1007.01.INTR.08.pdf
House Utilities, Energy and Telecommunications Amendment #2 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/committee-amendments/amendments/HB1007.01.INTR.AMH02.pdf
House Utilities, Energy and Telecommunications Amendment #3 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/committee-amendments/amendments/HB1007.01.INTR.AMH03.pdf
House Utilities, Energy and Telecommunications Amendment #2 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/committee-amendments/drafts/AM100702.pdf
House Utilities, Energy and Telecommunications Amendment #3 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/committee-amendments/drafts/AM100703.pdf
House Utilities, Energy and Telecommunications Amendment #1 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/committee-amendments/amendments/HB1007.01.INTR.AMH01.pdf
House Utilities, Energy and Telecommunications Amendment #1 https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/committee-amendments/drafts/AM100701.pdf
BillText https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/HB1007.01.INTR.pdf
Fiscal Note #1: Introduced https://iga.in.gov/pdf-documents/124/2025/house/bills/HB1007/fiscal-notes/HB1007.01.INTR.FN001.pdf
Loading...